£78 flat fee · VAT included

Washing Machine Installation

Bought a new washing machine? We disconnect the old one, plumb the new one into your existing water and waste, take out the transit bolts, level it and run a test wash before we leave.

Installation is charged at the same fixed fee as a washing machine repair visit — one price, agreed before we arrive.

1 year guarantee

What the visit includes

  • Disconnect the old machine and move it clear of the space
  • Remove the transit bolts and shipping brackets so the drum runs free
  • Connect the cold fill hose and the waste hose to your existing plumbing
  • Level the machine on your floor and check it is steady through a spin
  • Run a short test cycle and check every hose joint for leaks
  • Take the packaging away with us

Not included

These need a plumber, an electrician or a carpenter. We will tell you before we start if any of them apply.

  • New plumbing, new taps or a new waste trap — that needs a plumber first
  • Cutting worktops or cabinetry for an integrated machine
  • Taking the old machine off the property (tell the office when you book)

Questions

Washing machine installation, answered.

Is installation the same price as a repair?+

Yes. A washing machine installation costs the same flat fee as a washing machine repair visit, including VAT. There is no hourly rate and the price does not change with the make or model.

Do I have to buy the appliance from you?+

No. We install machines you have bought wherever you bought them. Just make sure the new machine is at the property, unwrapped, with its hoses and manual, on the day of the visit.

Do you take the old machine away?+

We disconnect it and move it clear so the new one can go in. If you need it taken off the property or disposed of, say so when you book and the office will confirm what we can do on the day.

How long does an installation take?+

About 45 to 60 minutes for a straightforward swap. Awkward access or plumbing that needs attention takes longer, but the fee stays the same.

What if extra parts or work are needed?+

We tell you before we do anything and you approve the cost first. Parts and materials are separate from the flat fee and always agreed in advance.

Other installations

Book your washing machine installation.

Same flat fee as a repair visit. Tell us the appliance and your postcode — we confirm the slot and the price before we arrive.

WhatsApp